| Acronym: GEM - 2 |
| Main Objective: 2nd Phase of the International Galactic Emission Mapping at Portugal. - test and installation of the 2.3GHz total power radiometer assembled in Brazil (by Marco bersannelli, Deputy-PI of Planck Surveyor sattellite) to complete the 2.3 GHz North Hemisphere survey in S-band - Calibration with cold load/hot load of the C-band correlator; calibration and first-light fo the polarimeter receiver. Overal: production of the first digital complex base-band cross-correllator using FPGA chips applyed to radioastronomy surveys. |
| Reference: PTDC/CTE-AST/65925/2006 |
| Funding: FCT/PTDC |
| Start Date: 01-07-2007 |
| End Date: 01-07-2010 |
| Team: Domingos da Silva Barbosa, Dinis Gomes de Magalhaes dos Santos, Rui Miguel Afonso Gomes da Fonseca |
| Groups: Integrated Circuits – Av |
| Partners: CENTRA - Instituto Superior Técnico, Lawrence Berkeley National Laboratory - University of California , Berkeley, Instituto Nacional de Pesquisas Espaciais do Brazil |
| Local Coordinator: Domingos da Silva Barbosa |
| Links:
http://www.av.it.pt/gem Internal Page |
|
|
|
Associated Publications
|